Fixed scope
Automation consolidation
Untangle overlapping triggers, flows and process builders on your core objects into one documented, order-controlled automation layer with tests.
Services / Salesforce Development
Governor-safe Apex, tested triggers, automation a new admin can read.
The problem
Anyone can ship a flow. Fewer people can tell you why three generations of automation all fire on the same object, in an order nobody controls, at quarter end.
We treat an org as production software: version control, deployment pipelines, real test coverage, an automation map. The measure is whether your admin can change it safely six months after we leave.
In the work
One query, one DML, tested at ten thousand records — not the two that clear a coverage gate. Metadata in version control, deployed through a pipeline.
Capabilities
6 capability groups
Typical engagements
Indicative scope and duration
Fixed scope
Untangle overlapping triggers, flows and process builders on your core objects into one documented, order-controlled automation layer with tests.
Fixed scope
Bidirectional integration between Salesforce and an ERP, billing system or data warehouse — with idempotency, retries, reconciliation reporting and alerting.
Embedded
A senior Salesforce engineer inside your sprint process for teams shipping continuously against the platform without a full-time hire.
What you get
Every trigger, flow and rule on your core objects, what fires when, and which ones are redundant or actively fighting each other.
Metadata under version control with CI validation, so changes move through sandboxes instead of being clicked in production.
Bulk-safe Apex tests asserting real behaviour at realistic volumes — not coverage padding written to clear a deployment gate.
A written walkthrough of the data model, integration contracts and known constraints, aimed at the person who owns the org next.
Questions
No, and you should be wary of anyone who says yes. Admins own configuration, users and process; we handle the engineering layer — Apex, LWC, integrations, deployment and performance. The best outcome is your admin ending the engagement with more confidence to make changes, not less.
With an audit, priced separately and small. Two to three weeks produces an automation map, a technical debt register ranked by risk, and a recommendation on sequence. That artefact is useful whether or not you continue with us, and it means the build phase is scoped against reality rather than optimism.
Flow where admins should own the logic and the volume is modest. Apex where you need bulk safety, complex branching, external calls or testable business rules. The failure mode we see most often is complex logic pushed into Flow because it felt faster, then hitting limits at quarter end with no tests to refactor against.
Also from Windsor Harlow
Most AI pilots die in month two. We build the parts that decide whether yours survives.…
→ →Cost and operability designed in as requirements, not cleaned up after the invoice arrives.…
→ →Distributed patterns that survive growth, without the premature architecture that sinks a product first.…
→Tell us the system, the constraint, and what happens if it is not solved. A senior engineer replies within one business day.